ASD Logo
Project and Construction Management for the 21st Century

 


 

ASD CONSTRUCTION PROJECTS

Laughlin AFB Bldg 210 Hanger Additions

Specifications

Prints

Broken by DIV for easy download

Complete package large file.

Complete package large file.

SPECS PRINTS
DIV I GEN. CONDITIONS TITLE SHEET
DIV II SITE WORK C-1 EXISTING SITE PLAN
DIV III CONCRETE C-2 DEMOLITION PLAN
DIV IV MASONRY C-3 PROPOSED SITE PLAN
DIV V METALS C-4 SIDEWALK DETAILS
DIV VI CARPENTRY A-1 FLOOR PLAN - EXISTING AND ENLARGED FLOOR PLAN - DEMOLITION
DIV VII MOISTURE AND THERMAL PROTECTION A-2 FLOOR PLAN - TOOL ROOM ADDITION AND REFLECTED CEILING PLAN, DOOR SCHEDULE, AND ROOM FINISH SCHEDULE
DIV VIII DOORS, WINDOWS AND GLASS. A-3 DOOR AND FRAME TYPES AND DOOR DETAILS
DIV IX FINISHES A-4 EXTERIOR ELEVATIONS
DIV X SPECIALTIES A-5 WALL SECTIONS
DIV XI NOT USED A-6 ALL SECTIONS &DETAILS
DIV XII NOT USED A-7 DETAILS
DIV XIII NOT USED S-1 GEN. NOTES AND TYPICAL DETAILS
DIV XIV NOT USED S-2 FLOOR FRAMING PLAN, FLOOR FRAMING PLAN SECTIONS
DIV XV MECHANICAL M0.1 MECHANICAL ABBREVIATIONS &SYMBOLS
DIV XVI ELECTRICAL M1.1 FLOOR PLAN - HVAC, FIRE PROTECTION, & PLUMBING
FIRE ALARM E0.1 ELECTRICAL ABBREVIATIONS & SYMBOLS
  E1.1 FLOOR PLAN- POWER, LIGHTING, & FIRE ALARM
   

 

LAUGHLIN AFB MUNITION CUBICLES

Specifications Prints Broken by DIV for easy download
Large file complete Large file complete
unavailable at this time  
Robluss Existing drawing Robluss Existing Drawing  
munitions bldg roadway modification 1